Engineering & delivery

An engineering partner for the full project.

Every line follows the same engineering workflow — planned around your product, tested before shipment, and supported after start-up.

weeks

From line brief to first production

Plan the line

—— weeks

Line configuration and footprint derived from your product, container and target output.

  • Product specification
  • Container format
  • Target BPH
  • Layout drawing
  • Utility requirement list
  • Quotation

Build & FAT

—— weeks

Full line manufacturing and pre-assembly, with integrated testing completed before shipment.

  • Plant drawings
  • Utility connection conditions
  • FAT report
  • Factory test footage

Install & ramp up

—— weeks on site

On-site installation and commissioning by our engineers, through SAT and operator training.

  • Utilities in place
  • Operating personnel
  • SAT report
  • Operating manual
  • Training record

Support & improve

Ongoing

Spare parts supply, remote diagnostics and scheduled maintenance.

  • ——
  • Spare parts response within —— hours
  • —— month warranty