01
Project brief
For a customer’s first carbonated-soft-drink line, the initial work is defining what the factory must produce. The Liberia record shows a project discussion around beverage and package samples before the line configuration was fixed.
02
Define the operating basis
Carbonation, container type, closure, filling conditions, label and pack format all affect equipment selection. Confirming these inputs early gives the customer a clearer scope for utilities, building space and staffing.
- Product and carbonation requirements
- Bottle or can format and closure
- Target output and operating hours
- Label, date code and secondary pack
03
A proposal built around the project
The result is not simply a filler model. It is a production route that connects product preparation, filling and packaging to the customer’s first-stage business plan.



